Soil vapor, sub-slab, and indoor air sampling to evaluate vapor intrusion risk — and, when mitigation is needed, SSD system design and installation oversight that clears regulatory review and protects occupants.
When a site has a history of chlorinated solvent or petroleum contamination — a former dry cleaner, a gas station, an industrial tenant — vapor intrusion into occupied buildings is one of the first things a regulator or buyer's environmental consultant will want evaluated. Getting the assessment wrong, or skipping it, is a liability problem that surfaces later, usually at the worst time.
We run vapor intrusion assessments that hold up to regulatory review — soil vapor, sub-slab, and indoor air sampling evaluated against OEHHA and DTSC/RWQCB screening levels — and if mitigation is warranted, we design sub-slab depressurization systems sized to the building and the contaminant, not an off-the-shelf template.
Post-installation, we verify the system is actually performing before we sign off, with sampling data to back it up.
Every step scoped to the building, the contaminant, and the regulatory driver.
Soil vapor, sub-slab, and/or indoor air sampling to characterize vapor intrusion risk at the specific building.
Results are compared against OEHHA and DTSC/RWQCB screening levels to determine whether mitigation is warranted.
If mitigation is needed, we design a site-specific SSD system and oversee installation and commissioning.
Post-mitigation sampling confirms the system is performing and supports regulatory sign-off.
If there's a documented history of chlorinated solvents (PCE, TCE) or petroleum contamination on or near the property — especially a former dry cleaner, gas station, or industrial use — a regulator or buyer's consultant will likely require one.
Assessment (sampling and risk evaluation) tells you whether a problem exists. Mitigation (an SSD system) is the fix, installed only when the assessment shows it's warranted — we don't recommend a system you don't need.
Design typically takes 1–2 weeks once sampling data is in hand; installation is usually completed in a few days depending on building size, with confirmation sampling shortly after.
Yes — assessments and mitigation designs are prepared to current OEHHA and DTSC/RWQCB guidance and documented for direct submission to the overseeing agency.
Serving Los Angeles, Orange County, San Diego, Riverside, Ventura, and all of Southern California. Most quotes turned around within 1 business day.